Current Projects

6th and Main

Construction of two commercial – residential buildings in downtown boise.

Idaho Fish and Game

Site work, Utilities, and paving for a new IDFG headquarters building.

Lander Street Waste Water Treatment Plant

MATES Sewer Lagoons

Construction of two new sewer lagoons, removal of liners and back-filling of existing lagoons

R&L Carriers

Construction of a new trucking terminal for R&L Carriers project includes Rock Blasting, Earth Work, Site Utilities, new roadway construction, and paving.

Washington School

Excavation of unsuitable soils, site utilities and bases for a school addition.

Past Projects

Ainkman Dam Reconstruction

Project entailed Raises on three dam structures with 400,000 cubic yards of excavation and embankment. Pipe installation and placement of 30,000 cubic yards of rip rap.

Delamar Mine Reclamation

Warner Construction has been contracted to close the Delamar Tailings facility. Work on this project involves heavy earth moving, placement of a clay cover system, and placement of topsoil.

Dixie Drain Phosphorus Removal Project

This project included excavation for lined storage ponds, mass excavation and embankment, deep pipe installation, and in water work for intake structures.

Oil and Gas Projects

Provided road and drill pad construction for oil and gas drilling projects, 24 hour support of drill operations, moving camps and materials to each drill pad, and handling of drilling fluids.

Rapid River Fish Hatchery

Reconstruction of the Rapid River fish hatchery as a sub to McAlvain Construction. Project highlights included multiple cofferdams and bypasses to facilitate construction in the river. Providing pumping systems to provide fresh water to the hatchery during intake shut downs, structural excavation, utilities, and paving.

Simplot JUMP

Mass excavation of 80,000 cubic yards for the underground parking structure under JUMP, de-watering, installation of Utilities, support of shoring operations, and landscape drainage systems.

St. Lukes Childrens Hospital

Mass excavation of 32 foot deep parking garage, support of shoring systems, de-watering of up to 1600 gpm for 8 months.